Process Equipment Installation
- Separators, dehydrators, heat exchangers, compressors
- Skid-mounted and modular units
Piping & Mechanical Systems
Prefabrication and field welding
High-pressure piping, valve stations, pipe racks
Rotating Equipment
Turbines, pumps, and generators
Alignment and vibration testing
Oil and gas plant equipment installation

Pre-Installation Planning
Site Preparation: Clearing, grading, and preparing foundations.
Engineering & Design Verification: Ensuring all P&IDs (Piping & Instrumentation Diagrams), structural, and mechanical drawings are validated.
Safety & Compliance Review: Checking standards (e.g., API, ASME, IEC) and local regulatory requirements.
Procurement and Logistics: Sourcing, transporting, and storing equipment safely on-site.

Installation Activities
Structural Installation: Installation of base frames, supports, and steel structures.
Mechanical Equipment Installation: Compressors, pumps, turbines, and separators.. Aligning rotating equipment with precision tools (laser alignment, etc.).
Piping Systems: Fabrication and erection of process, utility, and drain piping. Welding, NDT (non-destructive testing), and hydrotesting.

Commissioning & Handover
System-level checks (mechanical completion, pre-commissioning, commissioning).
Calibration and functional testing.
Final handover to operations team after site acceptance tests (SAT).
Safety and Quality Considerations
Heat exchangers, Pressure vessels, Pumps & compressors, Valves and actuators, Instrumentation and control systems
Installation Workflow: